McAfee Secured

Exam Code: JN0-364

Exam Name: Service Provider Routing and Switching, Specialist (JNCIS-SP)

Certification Provider: Juniper

100% Juniper JN0-364 Guaranteed Success With Testking Training Materials

Get Real JN0-364 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

69 Questions & Answers with Testing Engine

"Service Provider Routing and Switching, Specialist (JNCIS-SP) Exam", also known as JN0-364 exam, is a Juniper certification exam.

Pass your tests with the always up-to-date JN0-364 Exam Engine. Your JN0-364 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Juniper JN0-364 Practice Test 25

Question 240

In a separate fictional JNCIS-SP lab review for Fairhaven Broadband 060, a carrier-edge and core routing team, following a new customer connectivity turn-up, engineers find: An engineer sees an OSPF route in the routing table and closes the incident without testing the egress path. What is the direct residual network risk if the fault remains unresolved?

  1. Remote sites lose the service route or excessive routes leak into the IGP.
  2. A transit route remains unavailable because neighbor behavior is inconsistent.
  3. Customers still experience blackholes despite apparently healthy protocol neighbors.
  4. Intermittent route loss causes repeated customer outages.

Explanation

Correct Answer

C:

Customers still experience blackholes despite apparently healthy protocol neighbors. Verify active next-hop resolution and transit forwarding after OSPF convergence. A calculated OSPF path is not a substitute for functional packet forwarding validation.

Incorrect Answers

A:

Remote sites lose the service route or excessive routes leak into the IGP. The choice would be appropriate if a static service prefix is missing from OSPF because the export policy was attached but does not match it. Here, an engineer sees an OSPF route in the routing table and closes the incident without testing the egress path.

B:

A transit route remains unavailable because neighbor behavior is inconsistent. That option concerns OSPF adjacency setup fails on a network whose configured link type does not reflect point-to-point topology. The problem here is different: An engineer sees an OSPF route in the routing table and closes the incident without testing the egress path.

D:

Intermittent route loss causes repeated customer outages. This could matter when an upstream prefix repeatedly withdraws and returns but the operations view shows only the current best route. In this case, an engineer sees an OSPF route in the routing table and closes the incident without testing the egress path.

Question 241

At fictional Cedarwater Transit 061, a regional service-provider network, during a planned PE-to-core handoff, operations observes: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. Which targeted remediation best fits the reported behavior?

  1. Adjust the intended export policy match and confirm service-prefix advertisement.
  2. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency.
  3. Align the supported metric style and review full link metrics across the participating routing level.
  4. Investigate Ethernet MAC learning and bridge-table forwarding before changing IP routing.

Explanation

Correct Answer

B:

Align the intended IS-IS level capability for the shared link and inspect resulting adjacency. IS-IS neighbors require compatible level participation to exchange link-state information. The adjacency comes up at the planned level and routing information is exchanged correctly.

Incorrect Answers

A:

Adjust the intended export policy match and confirm service-prefix advertisement. This addresses a situation in which a customer service route never reaches another IS-IS area because the required export policy omits it; however, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

C:

Align the supported metric style and review full link metrics across the participating routing level. That option concerns an intended core link metric is truncated by a mismatched metric-style design and fails to shift paths as expected. The problem here is different: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Investigate Ethernet MAC learning and bridge-table forwarding before changing IP routing. It addresses a different problem: An operator adds an IP route to fix traffic that never leaves a local bridge domain because its destination MAC is unknown. Here, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 242

At fictional Cedarwater Transit 061, a regional service-provider network, during a planned PE-to-core handoff, operations observes: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. Why is this particular correction the best fit for the stated defect?

  1. A healthy IS-IS adjacency does not prove the intended shortest path is active in the forwarding plane.
  2. The IS-IS overload indication can discourage transit use during control-plane recovery.
  3. IS-IS neighbors require compatible level participation to exchange link-state information.
  4. Tunnel endpoints must use source and destination addresses that the underlay can route and permit.

Explanation

Correct Answer

C:

IS-IS neighbors require compatible level participation to exchange link-state information. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency. The adjacency comes up at the planned level and routing information is exchanged correctly.

Incorrect Answers

A:

A healthy IS-IS adjacency does not prove the intended shortest path is active in the forwarding plane. That relates to circumstances in which the IS-IS session reports established but a core prefix still follows an unexpected path after a circuit metric change. Here the problem is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

B:

The IS-IS overload indication can discourage transit use during control-plane recovery. This addresses a situation in which a newly rebooted core router attracts transit traffic while its forwarding state is still being restored; however, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Tunnel endpoints must use source and destination addresses that the underlay can route and permit. That option concerns a GRE tunnel appears operational in configuration but sources packets from an interface not permitted by the core ACL. The problem here is different: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 243

At fictional Cedarwater Transit 061, a regional service-provider network, during a planned PE-to-core handoff, operations observes: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. What direct observation would prove the corrective action worked?

  1. The expected neighbor appears with stable hold time and correct interface state.
  2. The adjacency comes up at the planned level and routing information is exchanged correctly.
  3. An L1 router installs the intended route toward the L1-L2 boundary and reaches test destinations.
  4. The active label operation now uses the recovered egress next hop.

Explanation

Correct Answer

B:

The adjacency comes up at the planned level and routing information is exchanged correctly. IS-IS neighbors require compatible level participation to exchange link-state information. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency.

Incorrect Answers

A:

The expected neighbor appears with stable hold time and correct interface state. It is useful for situations where an IS-IS neighbor remains down after an interface template disables its hello transmission; the reported fault, though, is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

C:

An L1 router installs the intended route toward the L1-L2 boundary and reaches test destinations. This addresses a situation in which an L1-only site lacks an approved route to reach destinations in the backbone after a level-transition change; however, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

The active label operation now uses the recovered egress next hop. The choice would be appropriate if after an IGP reconvergence, an old MPLS label still points to a failed interface on one transit device. Here, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 244

At fictional Cedarwater Transit 061, a regional service-provider network, during a planned PE-to-core handoff, operations observes: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. Which failure consequence follows most closely from ignoring this issue?

  1. Unplanned DIS churn produces extra flooding and convergence disruption.
  2. IPv6 traffic fails although the IPv4 IS-IS topology is healthy.
  3. A provider domain becomes partitioned and service prefixes disappear.
  4. Traffic is briefly blackholed during normal network convergence.

Explanation

Correct Answer

C:

A provider domain becomes partitioned and service prefixes disappear. IS-IS neighbors require compatible level participation to exchange link-state information. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency.

Incorrect Answers

A:

Unplanned DIS churn produces extra flooding and convergence disruption. This relates to a case where operators see two possible LAN-designated routers and assume the wrong one leads routing for the shared segment; the current situation is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

B:

IPv6 traffic fails although the IPv4 IS-IS topology is healthy. It is useful for situations where an IPv6 service prefix is missing from an IS-IS network because the necessary topology and family capability were not enabled; the reported fault, though, is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Traffic is briefly blackholed during normal network convergence. This addresses a situation in which a new core link attracts IP routes before its LDP labels are ready, causing a transient service outage; however, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 245

In a separate fictional JNCIS-SP lab review for Riverstone Networks 062, a carrier-edge and core routing team, following an audit of service-provider handoff behavior, engineers find: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. What intervention most directly restores the intended routing or switching behavior?

  1. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency.
  2. Adjust the intended export policy match and confirm service-prefix advertisement.
  3. Align the supported metric style and review full link metrics across the participating routing level.
  4. Review RSVP path constraints and explicit-route settings, then reestablish the LSP.

Explanation

Correct Answer

A:

Align the intended IS-IS level capability for the shared link and inspect resulting adjacency. The adjacency comes up at the planned level and routing information is exchanged correctly. IS-IS neighbors require compatible level participation to exchange link-state information.

Incorrect Answers

B:

Adjust the intended export policy match and confirm service-prefix advertisement. This relates to a case where a customer service route never reaches another IS-IS area because the required export policy omits it; the current situation is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

C:

Align the supported metric style and review full link metrics across the participating routing level. It is useful for situations where an intended core link metric is truncated by a mismatched metric-style design and fails to shift paths as expected; the reported fault, though, is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Review RSVP path constraints and explicit-route settings, then reestablish the LSP. That relates to circumstances in which an RSVP-signaled LSP follows a congested transit hop instead of the approved engineered route. Here the problem is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 246

In a separate fictional JNCIS-SP lab review for Riverstone Networks 062, a carrier-edge and core routing team, following an audit of service-provider handoff behavior, engineers find: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. Which networking principle explains why the proposed correction is appropriate?

  1. A healthy IS-IS adjacency does not prove the intended shortest path is active in the forwarding plane.
  2. IS-IS neighbors require compatible level participation to exchange link-state information.
  3. IS-IS system IDs must uniquely represent participating routers in the routing domain.
  4. Routing filters must match the relevant address family and intended prefix semantics.

Explanation

Correct Answer

B:

IS-IS neighbors require compatible level participation to exchange link-state information. The adjacency comes up at the planned level and routing information is exchanged correctly. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency.

Incorrect Answers

A:

A healthy IS-IS adjacency does not prove the intended shortest path is active in the forwarding plane. It is relevant if the IS-IS session reports established but a core prefix still follows an unexpected path after a circuit metric change, but the reported issue is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

C:

IS-IS system IDs must uniquely represent participating routers in the routing domain. This relates to a case where a device cloned from a lab template has the same IS-IS system ID as a production router; the current situation is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Routing filters must match the relevant address family and intended prefix semantics. It is useful for situations where a prefix-list filter written for IPv4 is applied conceptually to IPv6 routing, and all intended IPv6 routes vanish; the reported fault, though, is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 247

In a separate fictional JNCIS-SP lab review for Riverstone Networks 062, a carrier-edge and core routing team, following an audit of service-provider handoff behavior, engineers find: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. Which validation result would confirm the design is now functioning?

  1. The planned L1 adjacency forms and the corresponding area information is consistent.
  2. All routers compute the expected cost and favor the intended transit route.
  3. The adjacency comes up at the planned level and routing information is exchanged correctly.
  4. Each tenant's route lookup uses its own instance table and reaches only authorized customer next hops.

Explanation

Correct Answer

C:

The adjacency comes up at the planned level and routing information is exchanged correctly. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency. IS-IS neighbors require compatible level participation to exchange link-state information.

Incorrect Answers

A:

The planned L1 adjacency forms and the corresponding area information is consistent. This is applicable when a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up; the present condition is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

B:

All routers compute the expected cost and favor the intended transit route. It is relevant if an intended core link metric is truncated by a mismatched metric-style design and fails to shift paths as expected, but the reported issue is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

Each tenant's route lookup uses its own instance table and reaches only authorized customer next hops. This relates to a case where customer A traffic resolves through Customer B's route because both tenants were inadvertently configured in the same routing table; the current situation is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 248

In a separate fictional JNCIS-SP lab review for Riverstone Networks 062, a carrier-edge and core routing team, following an audit of service-provider handoff behavior, engineers find: Two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2. What likely service impact does this condition create?

  1. Operations declares recovery while customer packets use a degraded detour.
  2. A provider domain becomes partitioned and service prefixes disappear.
  3. Operators suppress genuine incidents after repeated false IS-IS alerts.
  4. IPv6 Internet service fails while IPv4 peering looks healthy.

Explanation

Correct Answer

B:

A provider domain becomes partitioned and service prefixes disappear. Align the intended IS-IS level capability for the shared link and inspect resulting adjacency. IS-IS neighbors require compatible level participation to exchange link-state information.

Incorrect Answers

A:

Operations declares recovery while customer packets use a degraded detour. That could help when the IS-IS session reports established but a core prefix still follows an unexpected path after a circuit metric change; here, two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

C:

Operators suppress genuine incidents after repeated false IS-IS alerts. It is relevant if a monitoring parser treats a valid IS-IS reachability TLV as an unsupported fault and pages the operations team, but the reported issue is that two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

D:

IPv6 Internet service fails while IPv4 peering looks healthy. This could help if an established BGP peer exchanges IPv4 but rejects all authorized IPv6 prefixes due to a misplaced family-specific filter, but not when two adjacent core routers cannot establish IS-IS because one is configured only for Level 1 and the other only for Level 2.

Question 249

At fictional Windmere Fiber 063, a regional service-provider network, during a two-site transit migration, operations observes: A Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up. Which configuration or operational correction most directly addresses this failure?

  1. Adjust the intended export policy match and confirm service-prefix advertisement.
  2. Inspect LSDB sequence and flooding state and repair the affected adjacency.
  3. Run a controlled member failure test and verify surviving-link service forwarding.
  4. Correct area address design or the adjacency level according to the provider topology.

Explanation

Correct Answer

D:

Correct area address design or the adjacency level according to the provider topology. Level 1 IS-IS requires appropriate area compatibility between neighbors. The planned L1 adjacency forms and the corresponding area information is consistent.

Incorrect Answers

A:

Adjust the intended export policy match and confirm service-prefix advertisement. This could matter when a customer service route never reaches another IS-IS area because the required export policy omits it. In this case, a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.

B:

Inspect LSDB sequence and flooding state and repair the affected adjacency. That could help when a remote PE misses a new loopback route because IS-IS link-state flooding is incomplete after an adjacency reset; here, a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.

C:

Run a controlled member failure test and verify surviving-link service forwarding. This is applicable when a provider assumes a two-member LAG is redundant but has never checked forwarding when one member fails; the present condition is that a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.

Question 250

At fictional Windmere Fiber 063, a regional service-provider network, during a two-site transit migration, operations observes: A Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up. Which Junos forwarding or control-plane rule applies to this case?

  1. Route policy controls which eligible nonnative prefixes are intentionally originated into IS-IS.
  2. IS-IS elects a designated intermediate system on broadcast networks to manage pseudonode representation.
  3. Level 1 IS-IS requires appropriate area compatibility between neighbors.
  4. Encapsulation adds frame overhead that must fit along the Layer 2 service path.

Explanation

Correct Answer

C:

Level 1 IS-IS requires appropriate area compatibility between neighbors. Correct area address design or the adjacency level according to the provider topology. The planned L1 adjacency forms and the corresponding area information is consistent.

Incorrect Answers

A:

Route policy controls which eligible nonnative prefixes are intentionally originated into IS-IS. It addresses a different problem: A customer service route never reaches another IS-IS area because the required export policy omits it. Here, a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.

B:

IS-IS elects a designated intermediate system on broadcast networks to manage pseudonode representation. This could matter when operators see two possible LAN-designated routers and assume the wrong one leads routing for the shared segment. In this case, a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.

D:

Encapsulation adds frame overhead that must fit along the Layer 2 service path. This is applicable when a service-provider QinQ link carries small frames but drops customer frames when the extra VLAN header exceeds the link MTU; the present condition is that a Level 1 IS-IS adjacency fails between routers with different area addresses even though the physical link is up.