McAfee Secured

Isaca CISA Bundle

Exam Code: CISA

Exam Name Certified Information Systems Auditor

Certification Provider: Isaca

Corresponding Certification: CISA

Isaca CISA Bundle $44.99

Pass Isaca CISA with Real Questions From Testking

Download Web's Best CISA Exam Preparation Materials Today

  • Questions & Answers with Expl.

    CISA Questions & Answers with Explanations

    1097 Questions & Answers with Explanations

    Questions & Answers Testing Engine software allows you to practice questions and answers in real CISA exam environment.

  • CISA Video Course

    CISA Video Course

    74 Video Lectures

    CISA Video Course is developed by Isaca Professionals to help you pass CISA exam.

    Description

    This course will improve your knowledge and skills required to pass Certified Information Systems Auditor exam.
  • Study Guide

    CISA Study Guide

    1141 PDF Pages

    Study Guide will give you a practical experience regarding the subject and provide an academic background. CISA Study Guide is available in PDF format.

Certified Information Systems Auditor (CISA) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers with Expl.

    Questions & Answers

    1097 Questions

    $124.99
  • CISA Video Course

    Video Course

    74 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    1141 PDF Pages

    $29.99

Isaca CISA Practice Test 83

Question 820

A cloud service has multi-zone replicas but all endpoints depend on the same unprotected identity service. Which lasting control most effectively reduces the recurring exposure?

  1. Include shared dependency fault analysis in resilience architecture reviews.
  2. Include carrier-route diversity evidence in multi-site designs.
  3. Require validated failover and application retry tests for critical services.
  4. Review power, cooling and site dependencies against resilience goals.

Explanation

Correct Answer

A:

Apparent compute redundancy is defeated by common supporting-service outages. The safeguard makes this specific requirement part of ongoing governance rather than a one-time fix.

Other Answers

B:

Geographic separation does not ensure resilience when there is a common physical link dependency. For this specific failure, the relevant preventive control is: Include shared dependency fault analysis in resilience architecture reviews.

C:

Manual intervention may exceed tolerated interruption despite spare infrastructure. For this specific failure, the relevant preventive control is: Include shared dependency fault analysis in resilience architecture reviews.

D:

High availability must match the specified fault scenario rather than nominal replica count. For this specific failure, the relevant preventive control is: Include shared dependency fault analysis in resilience architecture reviews.

Question 821

A warehouse control system uses redundant application nodes on one power feed despite a whole-building outage requirement. What action should take priority in the audit recommendation?

  1. Separate critical components across suitable physical power and site failure domains.
  2. Address the shared communications route with independent transport paths.
  3. Protect shared dependencies or provide a validated alternative to survive identity failure.
  4. Design automatic failover with application-appropriate recovery behavior and test it.

Explanation

Correct Answer

A:

High availability must match the specified fault scenario rather than nominal replica count. The confirming audit procedure is: Rehearse loss of the shared power feed and measure service recovery.

Other Answers

B:

Geographic separation does not ensure resilience when there is a common physical link dependency. For the stated failure, the appropriate corrective action is: Separate critical components across suitable physical power and site failure domains.

C:

Apparent compute redundancy is defeated by common supporting-service outages. For the stated failure, the appropriate corrective action is: Separate critical components across suitable physical power and site failure domains.

D:

Manual intervention may exceed tolerated interruption despite spare infrastructure. For the stated failure, the appropriate corrective action is: Separate critical components across suitable physical power and site failure domains.

Question 822

A warehouse control system uses redundant application nodes on one power feed despite a whole-building outage requirement. Which underlying assurance principle MOST directly explains the risk?

  1. Apparent compute redundancy is defeated by common supporting-service outages.
  2. Manual intervention may exceed tolerated interruption despite spare infrastructure.
  3. Geographic separation does not ensure resilience when there is a common physical link dependency.
  4. High availability must match the specified fault scenario rather than nominal replica count.

Explanation

Correct Answer

D:

High availability must match the specified fault scenario rather than nominal replica count. The practical correction is to separate critical components across suitable physical power and site failure domains.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. The risk in this scenario follows a different principle: High availability must match the specified fault scenario rather than nominal replica count.

B:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The risk in this scenario follows a different principle: High availability must match the specified fault scenario rather than nominal replica count.

C:

Geographic separation does not ensure resilience when there is a common physical link dependency. The risk in this scenario follows a different principle: High availability must match the specified fault scenario rather than nominal replica count.

Question 823

A warehouse control system uses redundant application nodes on one power feed despite a whole-building outage requirement. What observation would support closure of this particular finding?

  1. Fail a node mid-transaction and reconcile completed versus replayed work.
  2. Rehearse loss of the shared power feed and measure service recovery.
  3. Disable the shared route during a controlled drill and verify independent connectivity.
  4. Simulate identity service loss and verify agreed user transaction continuity.

Explanation

Correct Answer

B:

High availability must match the specified fault scenario rather than nominal replica count. The selected test checks this actual control outcome rather than merely related configuration.

Other Answers

A:

Node availability cannot guarantee correctness of in-flight business transactions. This does not establish the required evidence: Rehearse loss of the shared power feed and measure service recovery.

C:

Geographic separation does not ensure resilience when there is a common physical link dependency. This does not establish the required evidence: Rehearse loss of the shared power feed and measure service recovery.

D:

Apparent compute redundancy is defeated by common supporting-service outages. This does not establish the required evidence: Rehearse loss of the shared power feed and measure service recovery.

Question 824

A warehouse control system uses redundant application nodes on one power feed despite a whole-building outage requirement. What durable safeguard should management adopt for this situation?

  1. Include shared dependency fault analysis in resilience architecture reviews.
  2. Review power, cooling and site dependencies against resilience goals.
  3. Require validated failover and application retry tests for critical services.
  4. Use resilience acceptance tests that include data integrity and client retries.

Explanation

Correct Answer

B:

High availability must match the specified fault scenario rather than nominal replica count. The safeguard makes this specific requirement part of ongoing governance rather than a one-time fix.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. For this specific failure, the relevant preventive control is: Review power, cooling and site dependencies against resilience goals.

C:

Manual intervention may exceed tolerated interruption despite spare infrastructure. For this specific failure, the relevant preventive control is: Review power, cooling and site dependencies against resilience goals.

D:

Node availability cannot guarantee correctness of in-flight business transactions. For this specific failure, the relevant preventive control is: Review power, cooling and site dependencies against resilience goals.

Question 825

A critical service relies on manual restart after host failure, while business requires uninterrupted order acceptance. What is the most appropriate control remediation in this situation?

  1. Address the shared communications route with separate transport paths.
  2. Design automatic failover with application-appropriate recovery behavior and test it.
  3. Protect shared dependencies or provide a validated alternative to survive identity failure.
  4. Separate critical components across suitable physical power and site failure domains.

Explanation

Correct Answer

B:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The confirming audit procedure is: Inject a controlled node fault and measure customer transaction success.

Other Answers

A:

Geographic separation does not ensure resilience when there is a common physical link dependency. For the stated failure, the appropriate corrective action is: Design automatic failover with application-appropriate recovery behavior and test it.

C:

Apparent compute redundancy is defeated by common supporting-service outages. For the stated failure, the appropriate corrective action is: Design automatic failover with application-appropriate recovery behavior and test it.

D:

High availability must match the specified fault scenario rather than nominal replica count. For the stated failure, the appropriate corrective action is: Design automatic failover with application-appropriate recovery behavior and test it.

Question 826

A critical service relies on manual restart after host failure, while business requires uninterrupted order acceptance. Which control rationale is MOST relevant to the observed deficiency?

  1. Nominal compute redundancy is defeated by common supporting-service outages.
  2. Geographic separation does not ensure resilience when there is a common physical link dependency.
  3. High availability must match the specified fault scenario rather than nominal replica count.
  4. Manual intervention may exceed tolerated interruption despite spare infrastructure.

Explanation

Correct Answer

D:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The practical correction is to design automatic failover with application-appropriate recovery behavior and test it.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. The risk in this scenario follows a different principle: Manual intervention may exceed tolerated interruption despite spare infrastructure.

B:

Geographic separation does not ensure resilience when there is a common physical link dependency. The risk in this scenario follows a different principle: Manual intervention may exceed tolerated interruption despite spare infrastructure.

C:

High availability must match the specified fault scenario rather than nominal replica count. The risk in this scenario follows a different principle: Manual intervention may exceed tolerated interruption despite spare infrastructure.

Question 827

A critical service relies on manual restart after host failure, while business requires uninterrupted order acceptance. What verification would best discriminate a working fix from a promise?

  1. Simulate identity service loss and verify agreed user transaction continuity.
  2. Inject a controlled node fault and measure customer transaction success.
  3. Rehearse loss of the shared power feed and measure service recovery.
  4. Disable the shared route during a controlled drill and verify independent connectivity.

Explanation

Correct Answer

B:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The selected test checks this actual control outcome rather than merely related configuration.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. This does not establish the required evidence: Inject a controlled node fault and measure customer transaction success.

C:

High availability must match the specified fault scenario rather than nominal replica count. This does not establish the required evidence: Inject a controlled node fault and measure customer transaction success.

D:

Geographic separation does not ensure resilience when there is a common physical link dependency. This does not establish the required evidence: Inject a controlled node fault and measure customer transaction success.

Question 828

A critical service relies on manual restart after host failure, while business requires uninterrupted order acceptance. What ongoing monitoring or approval control matches this weakness?

  1. Incorporate shared dependency fault analysis in resilience architecture reviews.
  2. Include carrier-route diversity evidence in multi-site designs.
  3. Review power, cooling and site dependencies against resilience goals.
  4. Require validated failover and application retry tests for critical services.

Explanation

Correct Answer

D:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The safeguard makes this specific requirement part of ongoing governance rather than a one-time fix.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. For this specific failure, the relevant preventive control is: Require validated failover and application retry tests for critical services.

B:

Geographic separation does not ensure resilience when there is a common physical link dependency. For this specific failure, the relevant preventive control is: Require validated failover and application retry tests for critical services.

C:

High availability must match the specified fault scenario rather than nominal replica count. For this specific failure, the relevant preventive control is: Require validated failover and application retry tests for critical services.

Question 829

A service operates from two data centers but both depend on one telecom conduit crossing a flood-prone bridge. What should the IS auditor recommend as the first corrective step?

  1. Safeguard shared dependencies or provide a validated alternative to survive identity failure.
  2. Design automatic failover with application-appropriate recovery behavior and test it.
  3. Address the shared communications route with independent transport paths.
  4. Validate transaction and state recovery in representative failover exercises.

Explanation

Correct Answer

C:

Geographic separation does not ensure resilience when there is a common physical link dependency. The confirming audit procedure is: Disable the shared route during a controlled drill and verify independent connectivity.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. For the stated failure, the appropriate corrective action is: Address the shared communications route with independent transport paths.

B:

Manual intervention may exceed tolerated interruption despite spare infrastructure. For the stated failure, the appropriate corrective action is: Address the shared communications route with independent transport paths.

D:

Node availability cannot guarantee correctness of in-flight business transactions. For the stated failure, the appropriate corrective action is: Address the shared communications route with independent transport paths.

Question 830

A service operates from two data centers but both depend on one telecom conduit crossing a flood-prone bridge. Which statement describes the central risk mechanism?

  1. Apparent compute redundancy is defeated by common supporting-service outages.
  2. Node availability cannot guarantee correctness of in-flight business transactions.
  3. Manual intervention may exceed tolerated interruption despite spare infrastructure.
  4. Geographic separation does not ensure resilience when there is a common physical link dependency.

Explanation

Correct Answer

D:

Geographic separation does not ensure resilience when there is a common physical link dependency. The practical correction is to address the shared communications route with independent transport paths.

Other Answers

A:

Apparent compute redundancy is defeated by common supporting-service outages. The risk in this scenario follows a different principle: Geographic separation does not ensure resilience when there is a common physical link dependency.

B:

Node availability cannot guarantee correctness of in-flight business transactions. The risk in this scenario follows a different principle: Geographic separation does not ensure resilience when there is a common physical link dependency.

C:

Manual intervention may exceed tolerated interruption despite spare infrastructure. The risk in this scenario follows a different principle: Geographic separation does not ensure resilience when there is a common physical link dependency.