Question 470 To avoid replacing the wrong part, a technician reviews the issue: A legacy desktop PSU has a manual voltage selector set to 115 V but the computer is moved to a 230 V mains supply. Which verification is the most discriminating? The PSU main 20+4 pin connector is disconnected from the motherboard socket The supply's rating label and selector position do not match the local AC voltage The new PSU's cable pinout is not confirmed compatible with the old modular cable set Measured peak power and required PCIe power connectors exceed the PSU's continuous rating Explanation Correct Answer B:The supply's rating label and selector position do not match the local AC voltage, consistent with an incorrect psu input voltage selection. Incorrect Answers A:The PSU main 20+4 pin connector is disconnected from the motherboard socket, consistent with a missing motherboard 24-pin atx power connection. C:The new PSU's cable pinout is not confirmed compatible with the old modular cable set, consistent with an incompatible modular psu cable pinout risk. D:Measured peak power and required PCIe power connectors exceed the PSU's continuous rating, consistent with an insufficient psu wattage and headroom.
Question 471 A technician has a tentative diagnosis for this incident: A motherboard receives standby power but never starts; the main board connector is unplugged even though drive power plugs are connected. Which test result would support it most directly? The PSU main 20+4 pin connector is disconnected from the motherboard socket The chassis supports two PSU modules and can remain powered with one module disconnected The new PSU's cable pinout is not confirmed compatible with the old modular cable set The supply's rating label and selector position do not match the local AC voltage Explanation Correct Answer A:The PSU main 20+4 pin connector is disconnected from the motherboard socket, consistent with a missing motherboard 24-pin atx power connection. Incorrect Answers B:The chassis supports two PSU modules and can remain powered with one module disconnected, consistent with a redundant hot-swappable power supply modules. C:The new PSU's cable pinout is not confirmed compatible with the old modular cable set, consistent with an incompatible modular psu cable pinout risk. D:The supply's rating label and selector position do not match the local AC voltage, consistent with an incorrect psu input voltage selection.
Question 472 A graphics workstation adds a second GPU and begins restarting when both GPUs reach high load because total demand exceeds the old supply. Which evidence distinguishes the likely cause from other issues in the same technical area? The new PSU's cable pinout is not confirmed compatible with the old modular cable set Measured peak power and required PCIe power connectors exceed the PSU's continuous rating The supply's rating label and selector position do not match the local AC voltage The chassis supports two PSU modules and can remain powered with one module disconnected Explanation Correct Answer B:Measured peak power and required PCIe power connectors exceed the PSU's continuous rating, consistent with an insufficient psu wattage and headroom. Incorrect Answers A:The new PSU's cable pinout is not confirmed compatible with the old modular cable set, consistent with an incompatible modular psu cable pinout risk. C:The supply's rating label and selector position do not match the local AC voltage, consistent with an incorrect psu input voltage selection. D:The chassis supports two PSU modules and can remain powered with one module disconnected, consistent with a redundant hot-swappable power supply modules.
Question 473 Before repairing this fault, the service desk wants reproducible evidence: A storage server must keep running when one power supply module fails and has two independent AC feeds. Which finding is most relevant? The chassis supports two PSU modules and can remain powered with one module disconnected Measured peak power and required PCIe power connectors exceed the PSU's continuous rating The efficiency rating measures input-to-output conversion losses, not the PSU's maximum continuous wattage The PSU main 20+4 pin connector is disconnected from the motherboard socket Explanation Correct Answer A:The chassis supports two PSU modules and can remain powered with one module disconnected, consistent with a redundant hot-swappable power supply modules. Incorrect Answers B:Measured peak power and required PCIe power connectors exceed the PSU's continuous rating, consistent with an insufficient psu wattage and headroom. C:The efficiency rating measures input-to-output conversion losses, not the PSU's maximum continuous wattage, consistent with a power-supply efficiency versus rated output. D:The PSU main 20+4 pin connector is disconnected from the motherboard socket, consistent with a missing motherboard 24-pin atx power connection.
Question 474 After receiving the ticket, a senior technician asks: A technician replaces a modular PSU but reuses old manufacturer-specific modular cables because the device-side plugs fit. Which observation provides the best confirmation? Measured peak power and required PCIe power connectors exceed the PSU's continuous rating The supply's rating label and selector position do not match the local AC voltage The PSU main 20+4 pin connector is disconnected from the motherboard socket The new PSU's cable pinout is not confirmed compatible with the old modular cable set Explanation Correct Answer D:The new PSU's cable pinout is not confirmed compatible with the old modular cable set, consistent with an incompatible modular psu cable pinout risk. Incorrect Answers A:Measured peak power and required PCIe power connectors exceed the PSU's continuous rating, consistent with an insufficient psu wattage and headroom. B:The supply's rating label and selector position do not match the local AC voltage, consistent with an incorrect psu input voltage selection. C:The PSU main 20+4 pin connector is disconnected from the motherboard socket, consistent with a missing motherboard 24-pin atx power connection.
Question 475 Two otherwise similar supplies offer different 80 PLUS efficiency ratings; the buyer expects the higher rating to mean twice as much output power. Which additional observation would most strongly corroborate the suspected cause? The new PSU's cable pinout is not confirmed compatible with the old modular cable set Measured peak power and required PCIe power connectors exceed the PSU's continuous rating The efficiency rating measures input-to-output conversion losses, not the PSU's maximum continuous wattage The chassis supports two PSU modules and can remain powered with one module disconnected Explanation Correct Answer C:The efficiency rating measures input-to-output conversion losses, not the PSU's maximum continuous wattage, consistent with a power-supply efficiency versus rated output. Incorrect Answers A:The new PSU's cable pinout is not confirmed compatible with the old modular cable set, consistent with an incompatible modular psu cable pinout risk. B:Measured peak power and required PCIe power connectors exceed the PSU's continuous rating, consistent with an insufficient psu wattage and headroom. D:The chassis supports two PSU modules and can remain powered with one module disconnected, consistent with a redundant hot-swappable power supply modules.
Question 476 To avoid replacing the wrong part, a technician reviews the issue: An accounting group prints PDFs with specialized vector graphics but the chosen printer driver renders unsupported page description commands as symbols. Which verification is the most discriminating? The device can scan locally but has no valid SMTP relay credentials or allowed sender A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives The device and driver both support two-sided printing but the job preference is simplex Explanation Correct Answer B:A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware, consistent with a printer page-description language and driver compatibility. Incorrect Answers A:The device can scan locally but has no valid SMTP relay credentials or allowed sender, consistent with a scan-to-email server configuration missing. C:The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives, consistent with a secure print release with user authentication. D:The device and driver both support two-sided printing but the job preference is simplex, consistent with a duplex printing setting.
Question 477 A technician has a tentative diagnosis for this incident: A shared multifunction printer holds HR records and users want pages released only after they authenticate at the device. Which test result would support it most directly? A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware The server publishes a controlled shared queue and clients submit jobs to that central endpoint The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives The device can scan locally but has no valid SMTP relay credentials or allowed sender Explanation Correct Answer C:The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives, consistent with a secure print release with user authentication. Incorrect Answers A:A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware, consistent with a printer page-description language and driver compatibility. B:The server publishes a controlled shared queue and clients submit jobs to that central endpoint, consistent with a central print server and shared queue. D:The device can scan locally but has no valid SMTP relay credentials or allowed sender, consistent with a scan-to-email server configuration missing.
Question 478 A branch office wants long reports printed on both sides of each sheet, but the default output uses single-sided pages. Which evidence distinguishes the likely cause from other issues in the same technical area? The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives The available ADF supports simplex only while the requested workflow requires both sides The device and driver both support two-sided printing but the job preference is simplex The server publishes a controlled shared queue and clients submit jobs to that central endpoint Explanation Correct Answer C:The device and driver both support two-sided printing but the job preference is simplex, consistent with a duplex printing setting. Incorrect Answers A:The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives, consistent with a secure print release with user authentication. B:The available ADF supports simplex only while the requested workflow requires both sides, consistent with an automatic document feeder duplex scanning capability. D:The server publishes a controlled shared queue and clients submit jobs to that central endpoint, consistent with a central print server and shared queue.
Question 479 Before repairing this fault, the service desk wants reproducible evidence: A multifunction printer can print over Ethernet but sending scans by email fails because the device has no configured mail relay. Which finding is most relevant? The server publishes a controlled shared queue and clients submit jobs to that central endpoint The device can scan locally but has no valid SMTP relay credentials or allowed sender The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware Explanation Correct Answer B:The device can scan locally but has no valid SMTP relay credentials or allowed sender, consistent with a scan-to-email server configuration missing. Incorrect Answers A:The server publishes a controlled shared queue and clients submit jobs to that central endpoint, consistent with a central print server and shared queue. C:The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives, consistent with a secure print release with user authentication. D:A PCL/PostScript compatibility test identifies the incorrect driver language for the printer firmware, consistent with a printer page-description language and driver compatibility.
Question 480 After receiving the ticket, a senior technician asks: Employees in a small office must share one network printer without installing a direct connection individually on each workstation. Which observation provides the best confirmation? The device can scan locally but has no valid SMTP relay credentials or allowed sender The server publishes a controlled shared queue and clients submit jobs to that central endpoint The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives The device and driver both support two-sided printing but the job preference is simplex Explanation Correct Answer B:The server publishes a controlled shared queue and clients submit jobs to that central endpoint, consistent with a central print server and shared queue. Incorrect Answers A:The device can scan locally but has no valid SMTP relay credentials or allowed sender, consistent with a scan-to-email server configuration missing. C:The printer supports badge or PIN release and keeps jobs encrypted or queued until the user arrives, consistent with a secure print release with user authentication. D:The device and driver both support two-sided printing but the job preference is simplex, consistent with a duplex printing setting.