McAfee Secured

Microsoft AZ-801 Bundle

Exam Code: AZ-801

Exam Name Configuring Windows Server Hybrid Advanced Services

Certification Provider: Microsoft

Corresponding Certification: Microsoft Certified: Windows Server Hybrid Administrator Associate

Microsoft AZ-801 Bundle $14.99

Pass Microsoft AZ-801 with Real Questions From Testking

Download Web's Best AZ-801 Exam Preparation Materials Today

  • Questions & Answers

    AZ-801 Questions & Answers

    326 Questions & Answers

    Questions & Answers Testing Engine software allows you to practice questions and answers in real AZ-801 exam environment.

  • AZ-801 Video Course

    AZ-801 Video Course

    122 Video Lectures

    AZ-801 Video Course is developed by Microsoft Professionals to help you pass AZ-801 exam.

    Description

    This course will improve your knowledge and skills required to pass Configuring Windows Server Hybrid Advanced Services exam.

Configuring Windows Server Hybrid Advanced Services (AZ-801) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $154.98
Bundle Price: $139.99

Purchase Individually

  • Questions & Answers

    Questions & Answers

    326 Questions

    $124.99
  • AZ-801 Video Course

    Video Course

    122 Video Lectures

    $29.99

Microsoft AZ-801 Practice Test 35

Question 340

A production VM is ready for Azure Migrate cutover, yet administrators skip the test migration and discover missing drivers after DNS is switched. How can administrators make this correction durable through future changes?

  1. Keep appliance connectivity, credentials and collection health on the migration discovery readiness checklist.
  2. Maintain an application dependency map and revisit it before scheduling each migration wave.
  3. Enforce a change freeze and recovery-point review for each cutover wave.
  4. Make a documented test migration and rollback criteria mandatory before production migration approval.

Explanation

Correct Answer

D:

Make a documented test migration and rollback criteria mandatory before production migration approval. This preventive control maintains the intended protection because a test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. The initial action remains: Perform a non-disruptive test migration to an isolated Azure network and remediate drivers, services and network settings before final cutover.

Other Answers

A:

Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector. The stronger recurring control is to make a documented test migration and rollback criteria mandatory before production migration approval.

B:

Server migration order must account for application communications; migrating an apparently independent frontend can leave hidden dependencies unreachable. The stronger recurring control is to make a documented test migration and rollback criteria mandatory before production migration approval.

C:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. The lasting safeguard is to make a documented test migration and rollback criteria mandatory before production migration approval.

Question 341

An Azure Migrate replicated workload has a long pending synchronization queue, but the operator performs production cutover without confirming recovery points. What should the administrator change first to resolve the stated issue?

  1. Run a performance-based Azure Migrate assessment using representative utilization and required performance constraints.
  2. Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.
  3. Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.
  4. Perform a non-disruptive test migration to an isolated Azure network and remediate drivers, services and network settings before final cutover.

Explanation

Correct Answer

C:

Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence. This resolves the observed failure because migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. A suitable acceptance check is: Compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

Other Answers

A:

Rightsizing depends on measured consumption and target Azure capabilities rather than assuming physical server specifications map one-to-one. A more relevant action is to check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.

B:

Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. The required change instead is to check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.

D:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. This failure calls for a decision to check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.

Question 342

An Azure Migrate replicated workload has a long pending synchronization queue, but the operator performs production cutover without confirming recovery points. Which cause-and-effect mechanism best fits this evidence?

  1. Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.
  2. Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.
  3. A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM.
  4. Rightsizing depends on measured consumption and target Azure capabilities rather than assuming physical server specifications map one-to-one.

Explanation

Correct Answer

B:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. The mechanism explains the corrective action: Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence. The associated validation is: Compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

Other Answers

A:

Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. By contrast, migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.

C:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. In the stated system, migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.

D:

Rightsizing depends on measured consumption and target Azure capabilities rather than assuming physical server specifications map one-to-one. By contrast, migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.

Question 343

An Azure Migrate replicated workload has a long pending synchronization queue, but the operator performs production cutover without confirming recovery points. What should the engineer check to distinguish success from a superficial fix?

  1. Boot the test VM in isolation and validate application services, network interface settings, and attached data disks.
  2. Compare selected Azure VM sizing recommendations with collected source performance and a post-test utilization sample.
  3. Inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.
  4. Compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

Explanation

Correct Answer

D:

Compare the final source write and target application data after cutover and verify no unauthorized source writes persist. This evidence tests whether the team actually completed: Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence. It addresses the risk because migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.

Other Answers

A:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. Proving this correction calls for a check to compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

B:

Rightsizing depends on measured consumption and target Azure capabilities rather than assuming physical server specifications map one-to-one. The relevant acceptance check is to compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

C:

Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. A more meaningful verification is to compare the final source write and target application data after cutover and verify no unauthorized source writes persist.

Question 344

An Azure Migrate replicated workload has a long pending synchronization queue, but the operator performs production cutover without confirming recovery points. What should be added to the permanent maintenance checklist?

  1. Require workload owners to validate assessment windows and sizing assumptions before Azure resource purchases.
  2. Make a documented test migration and rollback criteria mandatory before production migration approval.
  3. Enforce a change freeze and recovery-point review for each cutover wave.
  4. Validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist.

Explanation

Correct Answer

C:

Enforce a change freeze and recovery-point review for each cutover wave. This preventive control maintains the intended protection because migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. The initial action remains: Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.

Other Answers

A:

Rightsizing depends on measured consumption and target Azure capabilities rather than assuming physical server specifications map one-to-one. The lasting safeguard is to enforce a change freeze and recovery-point review for each cutover wave.

B:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. Reducing this risk requires a practice to enforce a change freeze and recovery-point review for each cutover wave.

D:

Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. A more direct preventive measure is to enforce a change freeze and recovery-point review for each cutover wave.

Question 345

A migrated VM boots in Azure but management extensions fail because the service principal lacks permission for the target subscription. What is the most appropriate action given the observed constraints?

  1. Perform a non-disruptive test migration to an isolated Azure network and remediate drivers, services and network settings before final cutover.
  2. Deploy the supported Azure Migrate discovery appliance, authorize the source environment and validate inventory collection.
  3. Check replication health and ensure final supported synchronization before initiating the approved migration cutover sequence.
  4. Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.

Explanation

Correct Answer

D:

Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly. This resolves the observed failure because post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. A suitable acceptance check is: Inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

Other Answers

A:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. The required change instead is to correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.

B:

Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector. The corrective action for this requirement is to correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.

C:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. A more relevant action is to correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.

Question 346

A migrated VM boots in Azure but management extensions fail because the service principal lacks permission for the target subscription. What principle explains why the correct response works?

  1. Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell.
  2. A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM.
  3. Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.
  4. Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector.

Explanation

Correct Answer

C:

Post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. The mechanism explains the corrective action: Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly. The associated validation is: Inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

Other Answers

A:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. By contrast, post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.

B:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. By contrast, post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.

D:

Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector. In the stated system, post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.

Question 347

A migrated VM boots in Azure but management extensions fail because the service principal lacks permission for the target subscription. What observable evidence would verify that the fix succeeded?

  1. Confirm each expected server appears in discovery with refreshed CPU, memory, disk and network metadata.
  2. Compare the final source write and target application data after cutover and verify no unauthorized source writes persist.
  3. Boot the test VM in isolation and validate application services, network interface settings, and attached data disks.
  4. Inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

Explanation

Correct Answer

D:

Inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege. This evidence tests whether the team actually completed: Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly. It addresses the risk because post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state.

Other Answers

A:

Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector. The relevant acceptance check is to inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

B:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. A more meaningful verification is to inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

C:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. Proving this correction calls for a check to inspect extension provisioning status and audit logs, then apply a harmless test extension using least privilege.

Question 348

A migrated VM boots in Azure but management extensions fail because the service principal lacks permission for the target subscription. What control should be sustained after the immediate fix?

  1. Keep appliance connectivity, credentials and collection health on the migration discovery readiness checklist.
  2. Validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist.
  3. Make a documented test migration and rollback criteria mandatory before production migration approval.
  4. Enforce a change freeze and recovery-point review for each cutover wave.

Explanation

Correct Answer

B:

Validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist. This preventive control maintains the intended protection because post-migration service configuration requires authorized Azure resource actions independent of the guest OS boot state. The initial action remains: Correct scoped identity permissions and supported VM or Arc extension prerequisites rather than recreating the migrated workload blindly.

Other Answers

A:

Azure Migrate assessment requires discovered workload configuration and performance signals from the appropriate source connector. A more direct preventive measure is to validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist.

C:

A test migration reveals runtime dependencies and guest compatibility without committing production traffic to the target VM. The stronger recurring control is to validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist.

D:

Migrated server freshness depends on replicated recovery-point state, not solely on the presence of a target Azure VM shell. Reducing this risk requires a practice to validate post-migration extension identities and target resource-provider permissions in the Azure landing zone checklist.

Question 349

A Windows DHCP server migration restores scopes but clients receive no offers because the new server was not authorized in Active Directory. Which next corrective action best addresses this failure?

  1. Migrate the supported IIS configuration and required encryption key material through a secured process with application identity validation.
  2. Inventory Hyper-V VM configuration versions and choose a supported export/import or live-migration path with compatibility checks.
  3. Use a supported print migration export/import process and verify driver compatibility, queue shares and security permissions on the target.
  4. Export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source.

Explanation

Correct Answer

D:

Export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source. This resolves the observed failure because domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready. A suitable acceptance check is: Request a lease from an isolated test subnet and check server authorization and scope options.

Other Answers

A:

IIS configuration may depend on host-specific protected secrets and application-pool identities beyond copying content and XML settings. The corrective action for this requirement is to export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source.

B:

Hyper-V migrations depend on supported hypervisor, VM configuration and CPU features rather than file transfer alone. The corrective action for this requirement is to export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source.

C:

Print spooler state includes drivers, ports, queues and access rules; a simple share-name copy omits required dependencies. The corrective action for this requirement is to export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source.

Question 350

A Windows DHCP server migration restores scopes but clients receive no offers because the new server was not authorized in Active Directory. Why does the proposed solution address the underlying problem?

  1. IIS configuration may depend on host-specific protected secrets and application-pool identities beyond copying content and XML settings.
  2. Print spooler state includes drivers, ports, queues and access rules; a simple share-name copy omits required dependencies.
  3. Domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready.
  4. Hyper-V migrations depend on supported hypervisor, VM configuration and CPU features rather than file transfer alone.

Explanation

Correct Answer

C:

Domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready. The mechanism explains the corrective action: Export and import supported DHCP scope configuration and authorize the new DHCP server in AD DS before retiring the old source. The associated validation is: Request a lease from an isolated test subnet and check server authorization and scope options.

Other Answers

A:

IIS configuration may depend on host-specific protected secrets and application-pool identities beyond copying content and XML settings. In the stated system, domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready.

B:

Print spooler state includes drivers, ports, queues and access rules; a simple share-name copy omits required dependencies. In the stated system, domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready.

D:

Hyper-V migrations depend on supported hypervisor, VM configuration and CPU features rather than file transfer alone. In the stated system, domain-joined DHCP servers can require AD authorization to provide leases; copying scopes alone does not make a new server service-ready.