McAfee Secured

Exam Code: NSE5_FSW_AD-7.6

Exam Name: Fortinet NSE 5 - FortiSwitch 7.6 Administrator

Certification Provider: Fortinet

Corresponding Certification: NSE5

100% Fortinet NSE5_FSW_AD-7.6 Guaranteed Success With Testking Training Materials

Get Real NSE5_FSW_AD-7.6 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

64 Questions & Answers with Testing Engine

"Fortinet NSE 5 - FortiSwitch 7.6 Administrator Exam", also known as NSE5_FSW_AD-7.6 exam, is a Fortinet certification exam.

Pass your tests with the always up-to-date NSE5_FSW_AD-7.6 Exam Engine. Your NSE5_FSW_AD-7.6 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Fortinet NSE5_FSW_AD-7.6 Practice Test 15

Question 140

A FortiSwitch standalone configuration can reach local subnets but cannot reach management services beyond its default network. What long-term control would best prevent this issue from recurring?

  1. Classify STP boundary ports and apply protective guard settings under a reviewed baseline.
  2. Add management routing and next-hop verification to initial switch acceptance.
  3. Audit edge-port definitions and BPDU-guard coverage during closet changes.
  4. Record routing adjacency and prefix baselines to compare against future configuration changes.

Explanation

Correct Answer

B:

Add management routing and next-hop verification to initial switch acceptance. This guards against recurrence because Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Other Answers

A:

Classify STP boundary ports and apply protective guard settings under a reviewed baseline. That guardrail is most relevant when a contractor installs a switch into a port that should never be able to influence the spanning-tree root election. It would not reliably prevent the stated problem. The direct preventive control is: Add management routing and next-hop verification to initial switch acceptance.

C:

Audit edge-port definitions and BPDU-guard coverage during closet changes. That guardrail is most relevant when a conference room bridge sends spanning-tree control frames on a port designated as an edge endpoint interface. It would not reliably prevent the stated problem. The direct preventive control is: Add management routing and next-hop verification to initial switch acceptance.

D:

Record routing adjacency and prefix baselines to compare against future configuration changes. That preventive measure addresses another exposure: A branch layer 3 switch reports healthy physical interfaces but routing to a new transit prefix fails after neighbor parameter changes. This scenario requires the following control to reduce recurrence: Add management routing and next-hop verification to initial switch acceptance.

Question 141

A branch device forwards local traffic yet monitoring at a different site fails because the switch lacks the proper management route. What is the most appropriate first corrective decision?

  1. Check interface addressing and the relevant route or adjacency state on the platform before altering physical switching.
  2. Check the relevant management IP, gateway, routing table, and reachability before changing unrelated VLAN parameters.
  3. Configure the FortiSwitch MCLAG peer relationship, required inter-chassis connectivity, and supported downstream trunks before enabling dual-homing.
  4. Add the required tagged VLAN to the allowed VLAN lists on both ends of the appropriate uplink, preserving native VLAN intent.

Explanation

Correct Answer

B:

Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability. To validate the correction: Inspect route entries and trace a permitted remote management probe to its destination and return path.

Other Answers

A:

Correct network-layer forwarding depends on reachable next hops and, where used, valid routing protocol neighbor state. It does not resolve the specific failure; the targeted correction is: Check the relevant management IP, gateway, routing table, and reachability before changing unrelated VLAN parameters.

C:

A multichassis link aggregation group requires cooperating peers and an inter-chassis control and data path rather than two unrelated LAG endpoints. It does not resolve the specific failure; the targeted correction is: Check the relevant management IP, gateway, routing table, and reachability before changing unrelated VLAN parameters.

D:

Add the required tagged VLAN to the allowed VLAN lists on both ends of the appropriate uplink, preserving native VLAN intent. This is a reasonable response when an uplink between two FortiSwitch units carries the default VLAN but drops tagged voice VLAN 230 at the second switch. It does not target the current root cause: Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Question 142

A branch device forwards local traffic yet monitoring at a different site fails because the switch lacks the proper management route. Which explanation supports the correct engineering approach?

  1. Layer 2 segmentation does not provide Layer 3 reachability; gateways and policies govern traffic moving between subnets.
  2. Loop guard can block an unsafe transition to forwarding when expected BPDUs disappear on susceptible ports.
  3. An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.
  4. Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Explanation

Correct Answer

D:

Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability. It explains why this specific change is appropriate: Check the relevant management IP, gateway, routing table, and reachability before changing unrelated VLAN parameters. The result can be checked by: Inspect route entries and trace a permitted remote management probe to its destination and return path.

Other Answers

A:

Layer 2 segmentation does not provide Layer 3 reachability; gateways and policies govern traffic moving between subnets. The cause in the stated scenario is different: Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

B:

Loop guard can block an unsafe transition to forwarding when expected BPDUs disappear on susceptible ports. The cause in the stated scenario is different: Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

C:

An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs. The cause in the stated scenario is different: Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Question 143

A branch device forwards local traffic yet monitoring at a different site fails because the switch lacks the proper management route. What should the administrator measure to demonstrate the change works?

  1. Check route installation and the return path with a traced test to the affected subnet.
  2. Inspect topology discovery and verify failover by disabling one planned inter-switch link without flooding or management loss.
  3. Verify split-interface state and controlled failover, then validate both active paths only after completing the approved MCLAG transition.
  4. Inspect route entries and trace a permitted remote management probe to its destination and return path.

Explanation

Correct Answer

D:

Inspect route entries and trace a permitted remote management probe to its destination and return path. This checks the outcome of the selected action: Check the relevant management IP, gateway, routing table, and reachability before changing unrelated VLAN parameters. The relevant network behavior is: Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Other Answers

A:

Check route installation and the return path with a traced test to the affected subnet. That test would be valuable for a different deployment: A FortiSwitch can resolve its direct neighbor but an OSPF learned route to a remote subnet disappears after a routing change. For the current scenario it does not validate the targeted fix; the necessary evidence is: Inspect route entries and trace a permitted remote management probe to its destination and return path.

B:

Inspect topology discovery and verify failover by disabling one planned inter-switch link without flooding or management loss. This could confirm success where a FortiSwitch stack is connected in a ring, but administrators add a loop through the FortiGate rather than following the supported inter-switch link path. The requested condition should instead be verified by: Inspect route entries and trace a permitted remote management probe to its destination and return path.

C:

Verify split-interface state and controlled failover, then validate both active paths only after completing the approved MCLAG transition. That test would be valuable for a different deployment: An engineer expects both FortiLink uplinks to be active immediately in a dual-switch design that has not yet established MCLAG. For the current scenario it does not validate the targeted fix; the necessary evidence is: Inspect route entries and trace a permitted remote management probe to its destination and return path.

Question 144

A branch device forwards local traffic yet monitoring at a different site fails because the switch lacks the proper management route. Which preventive policy best addresses the same failure mode?

  1. Record routing adjacency and prefix baselines to compare against future configuration changes.
  2. Maintain matching trunk-allowed VLAN inventories and test each new VLAN end to end before handover.
  3. Require loop-safe patching diagrams and port safeguards before any temporary network extension.
  4. Add management routing and next-hop verification to initial switch acceptance.

Explanation

Correct Answer

D:

Add management routing and next-hop verification to initial switch acceptance. This guards against recurrence because Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.

Other Answers

A:

Record routing adjacency and prefix baselines to compare against future configuration changes. That guardrail is most relevant when a branch layer 3 switch reports healthy physical interfaces but routing to a new transit prefix fails after neighbor parameter changes. It would not reliably prevent the stated problem. The direct preventive control is: Add management routing and next-hop verification to initial switch acceptance.

B:

Maintain matching trunk-allowed VLAN inventories and test each new VLAN end to end before handover. That preventive measure addresses another exposure: An added building-security VLAN is locally configured yet disappears on the trunk toward the distribution switch. This scenario requires the following control to reduce recurrence: Add management routing and next-hop verification to initial switch acceptance.

C:

Require loop-safe patching diagrams and port safeguards before any temporary network extension. That guardrail is most relevant when a factory floor adds a dual-port bridge that creates a Layer 2 loop, generating topology changes and MAC flapping. It would not reliably prevent the stated problem. The direct preventive control is: Add management routing and next-hop verification to initial switch acceptance.

Question 145

An uplink works until a switch interface is changed from tagged trunk behavior to an untagged access role, causing multiple VLANs to disappear. Which configuration or design adjustment best meets the requirement?

  1. Check interface addressing and the relevant route or adjacency state on the platform before altering physical switching.
  2. Inspect the failure that stopped BPDUs and restore the correct neighbor and link behavior rather than disabling loop guard globally.
  3. Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic.
  4. Review the supported FortiGate HA and FortiLink wiring topology and separate physical failure domains.

Explanation

Correct Answer

C:

An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs. To validate the correction: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

Other Answers

A:

Correct network-layer forwarding depends on reachable next hops and, where used, valid routing protocol neighbor state. It does not resolve the specific failure; the targeted correction is: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic.

B:

Inspect the failure that stopped BPDUs and restore the correct neighbor and link behavior rather than disabling loop guard globally. This is a reasonable response when a switch port enters a loop-inconsistent protective state when it stops hearing required STP messages. It does not target the current root cause: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

D:

Controller redundancy does not protect switching availability when managed-switch transports share a single point of failure. It does not resolve the specific failure; the targeted correction is: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic.

Question 146

An uplink works until a switch interface is changed from tagged trunk behavior to an untagged access role, causing multiple VLANs to disappear. Which explanation supports the correct engineering approach?

  1. Link aggregation presents compatible member ports as one logical connection and depends on agreement between ends.
  2. Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability.
  3. Redundant topology behavior is software- and platform-sensitive; uncoordinated upgrades can break peer state despite healthy cables.
  4. An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Explanation

Correct Answer

D:

An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs. It explains why this specific change is appropriate: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic. The result can be checked by: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

Other Answers

A:

Link aggregation presents compatible member ports as one logical connection and depends on agreement between ends. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

B:

Packets to remote networks require a valid next-hop route; link and VLAN status alone do not establish routed management reachability. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

C:

Redundant topology behavior is software- and platform-sensitive; uncoordinated upgrades can break peer state despite healthy cables. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Question 147

An uplink works until a switch interface is changed from tagged trunk behavior to an untagged access role, causing multiple VLANs to disappear. What diagnostic or functional result provides the strongest acceptance evidence?

  1. Check the managed port configuration and confirm the client is learned in the intended VLAN after reconnecting.
  2. Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.
  3. Inspect regional configuration and per-instance root and port roles during a controlled failover test.
  4. Check route installation and the return path with a traced test to the affected subnet.

Explanation

Correct Answer

B:

Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink. This checks the outcome of the selected action: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic. The relevant network behavior is: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Other Answers

A:

Check the managed port configuration and confirm the client is learned in the intended VLAN after reconnecting. That test would be valuable for a different deployment: A newly authorized FortiSwitch shows the correct VLAN object on FortiGate, but the edge port still puts connected devices into the old subnet. For the current scenario it does not validate the targeted fix; the necessary evidence is: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

C:

Inspect regional configuration and per-instance root and port roles during a controlled failover test. That test would be valuable for a different deployment: An extended campus sees unexpected alternate-port choices because MSTP region names and VLAN-instance maps differ. For the current scenario it does not validate the targeted fix; the necessary evidence is: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

D:

Check route installation and the return path with a traced test to the affected subnet. This could confirm success where a branch layer 3 switch reports healthy physical interfaces but routing to a new transit prefix fails after neighbor parameter changes. The requested condition should instead be verified by: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

Question 148

An uplink works until a switch interface is changed from tagged trunk behavior to an untagged access role, causing multiple VLANs to disappear. What change to the implementation checklist would reduce this specific risk?

  1. Add management routing and next-hop verification to initial switch acceptance.
  2. Mark uplinks and edge ports explicitly in change templates and restrict role changes.
  3. Review routing and policy reachability whenever a new FortiSwitch VLAN is introduced.
  4. Validate MCLAG peer readiness before any access dual-homing migration.

Explanation

Correct Answer

B:

Mark uplinks and edge ports explicitly in change templates and restrict role changes. This guards against recurrence because An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Other Answers

A:

Add management routing and next-hop verification to initial switch acceptance. That guardrail is most relevant when a FortiSwitch standalone configuration can reach local subnets but cannot reach management services beyond its default network. It would not reliably prevent the stated problem. The direct preventive control is: Mark uplinks and edge ports explicitly in change templates and restrict role changes.

C:

Review routing and policy reachability whenever a new FortiSwitch VLAN is introduced. That guardrail is most relevant when clients in two VLANs can reach their own gateways but inter-VLAN applications are blocked despite switch port links being healthy. It would not reliably prevent the stated problem. The direct preventive control is: Mark uplinks and edge ports explicitly in change templates and restrict role changes.

D:

Validate MCLAG peer readiness before any access dual-homing migration. That preventive measure addresses another exposure: A university configures two switch uplinks into an access LAG without first establishing the supported MCLAG peers. This scenario requires the following control to reduce recurrence: Mark uplinks and edge ports explicitly in change templates and restrict role changes.

Question 149

A technician converts the distribution-facing port to a single access VLAN while it still carries several production segments. What is the most appropriate first corrective decision?

  1. Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic.
  2. Align both peer LAG configurations, compatible member properties, and LACP expectations before testing the logical bundle.
  3. Apply supported root guard on the appropriate designated boundary and restore the intended STP root placement.
  4. Verify the effective managed-switch port settings in FortiGate and correct the native VLAN assignment on the specific edge interface.

Explanation

Correct Answer

A:

An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs. To validate the correction: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

Other Answers

B:

Align both peer LAG configurations, compatible member properties, and LACP expectations before testing the logical bundle. This is a reasonable response when a FortiSwitch LAG contains two physical members but the peer uses inconsistent aggregation settings, leaving one member inactive. It does not target the current root cause: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

C:

Root guard protects the intended root topology against unexpected superior BPDUs on guarded ports. It does not resolve the specific failure; the targeted correction is: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic.

D:

Verify the effective managed-switch port settings in FortiGate and correct the native VLAN assignment on the specific edge interface. This is a reasonable response when a FortiLink-managed switch has an approved user VLAN but one access port inherits a different native VLAN from an earlier template. It does not target the current root cause: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Question 150

A technician converts the distribution-facing port to a single access VLAN while it still carries several production segments. Which explanation supports the correct engineering approach?

  1. Ethernet loops replicate flooded frames and disrupt MAC learning; disabling protection can enlarge rather than solve the outage.
  2. FortiLink split-interface mode deliberately keeps only one uplink active until a suitable MCLAG peer design enables safe dual-active paths.
  3. An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.
  4. Ethernet learning becomes unstable when the same source MAC appears on competing looped paths, often accompanied by flooding.

Explanation

Correct Answer

C:

An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs. It explains why this specific change is appropriate: Restore the approved trunk VLAN membership and identify edge versus uplink roles before reintroducing traffic. The result can be checked by: Test each required VLAN at the far endpoint and confirm forbidden VLANs do not traverse the restored uplink.

Other Answers

A:

Ethernet loops replicate flooded frames and disrupt MAC learning; disabling protection can enlarge rather than solve the outage. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

B:

FortiLink split-interface mode deliberately keeps only one uplink active until a suitable MCLAG peer design enables safe dual-active paths. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

D:

Ethernet learning becomes unstable when the same source MAC appears on competing looped paths, often accompanied by flooding. The cause in the stated scenario is different: An access VLAN forwards ordinary endpoint frames for one segment; a trunk must carry all approved tagged VLANs.

Fortinet NSE 5 - FortiSwitch 7.6 Administrator (NSE5_FSW_AD-7.6) Practice Tests